Design-Build
Design-build is a project delivery method in which one contract covers both the design of a home and its construction. A single company, or a team led by one, answers for the drawings and the finished house, so the owner deals with one accountable party instead of two separate agreements.
Arizona defines the term in statute. A.R.S. 34-101, the definitions section for public construction procurement, describes design-build as a method in which "there is a single contract for design services and construction services." Private custom homes borrow the structure without the public bidding rules. You sign one agreement, and the party behind it owns both the plans and the house.
One contract changes who answers for what. If a window detail leaks, there is no argument over whether the drawing was wrong or the installation was. The same entity is on the hook either way, which is what single point of accountability means. The phases also overlap. The team can price the truss package while interior selections are still open, and grading can start before the last elevation is final. That overlap often pulls weeks off the calendar.
The construction half still needs its own credential. A.R.S. 32-1102 sorts Arizona contractor licenses into classes, among them general residential contracting and general dual licensed contracting. A design firm cannot simply extend its scope into building. Whoever signs must hold, or partner with a holder of, the right ROC class for residential work. Check the contractor's license number on the contract, not the marketing page.
The trade-off is pricing pressure. You choose the builder before finished drawings exist, so there is no plan set to send to three general contractors for competing numbers. You buy on reputation, past work, and a transparent fee. For example, a Fountain Hills owner who hires a design-build team in January gets one contract and an earlier start, and never learns what two other builders would have charged.
Design-build differs from design-bid-build, where an architect finishes the drawings under one agreement and a separate contractor builds them under another. Before signing, ask how the design fee is separated, so you know what you owe if you like the plans but not the price.
Keep exploring
Related terms
Questions that use this term
Short answers first. Open one to read it here.
What is the difference between design-build and design-bid-build, and which is right for a custom home?
In design-bid-build you complete the design first, then bid it out and hire a separate builder; the phases are sequential and the designer and...
Read the full answerDo my house plans need an engineer's or architect's stamp in Arizona?
Usually a registered architect is optional for a single-family home under Arizona's residential exemption, but a licensed engineer's stamp is often...
Read the full answerCan I change the floor plan during a custom home build?
Yes, you can change the floor plan during a custom home build, but it gets harder and costlier as the build goes.
Read the full answerHow much do custom house plans cost in Arizona?
Custom house plans in Arizona usually cost 5 to 15 percent of construction cost.
Read the full answer