Paradise Valley Residential Building Permit Requirements: What You File and How Review Works

A new home in Paradise Valley needs a building permit before any work starts. You apply through the Town's online Citizen Portal with a scaled site plan, floor plans, and engineered construction documents, then pay fees from the Town's Master Fee Schedule. Town staff review every plan against the adopted Town codes before the permit issues.

Updated June 29, 2026 4 min read
Primary sourceTown of Paradise Valley Building Department

You cannot pour a footing or frame a wall on a new Paradise Valley home until the Town issues a building permit. The permit is the Town's sign-off that your plans meet the adopted codes and your lot's zoning. This page walks the real steps: what you submit, how the Town's online system handles it, how fees are set, and what review looks like for a custom home in a town known for large estates.

What a residential permit requires

Paradise Valley takes applications through its online Citizen Portal, the Town's Accela-based permitting system. You create an account, upload your plan set, and submit there. The Town issues separate permits for the different parts of a job, and the Building Department lists the types it handles:

Building, Banner, Demolition, Electrical, Fence/Site Walls, Mechanical, Plumbing, and Pool/Spa permits.

A complete single-family submittal generally includes a site plan drawn to scale showing the house on the lot with setbacks (the required distance from each property line) called out, floor plans, and structural and construction documents engineered for Paradise Valley's local design values, including the 115 mph wind speed and Seismic Design Category B the Town fixes for its area. The Town reviews and approves every set against its adopted codes before a permit issues.

How fees and timing work

Fees come from the Town's published Master Fee Schedule, which sets the cost of each permit type, so you can price the permit before you apply. The Town also runs on a tight counter clock and states it plainly:

The Town of Paradise Valley does not accept application submittals, payments, nor release permits after 3:30 p.m.

The Building Department is open Monday through Friday, 7 a.m. to noon and 1 to 4 p.m., with the office closed for lunch. For example, if you submit a custom home set at 3 p.m., it clears the same-day cutoff, but a resubmittal you upload at 3:45 p.m. does not count until the next business day. The flow is: submit through the Citizen Portal, Town staff review the plans against the adopted Town codes, you address any corrections and resubmit, then you pay fees and the permit issues. After that the work moves to field inspections, and the home is not legal to occupy until it passes final inspection and the Town issues a certificate of occupancy .

When this comes into play

This process governs the front end of every Paradise Valley build:

  • Build-on-your-lot. Your designer assembles the Citizen Portal package, you pay from the Master Fee Schedule, and the Town reviews the set against its adopted 2015 codes and 2021 fire code.
  • Owner-builder. If you pull the permit yourself instead of using a licensed contractor, you carry the responsibility a contractor normally would. Arizona's owner-builder exemption under A.R.S. 32-1121 only covers a home you intend to occupy yourself, not one built for sale or rent within a year, so pulling your own permit ties you to that legal limit.
  • Resubmittals. If review finds corrections, you fix the sheets and re-upload through the portal. Each round adds calendar time, and the 3:30 p.m. cutoff means a late-day resubmittal does not count until the next business day, so plan your filing earlier in the day.

What this means for you

Budget for the permit as a real line item and pull the Master Fee Schedule early so the permit cost is no surprise. Get the site plan setbacks right the first time, because a setback violation is one of the most common reasons a residential plan gets corrected, and it matters on the large estate lots Paradise Valley is built around. Draw your structural, energy, and electrical sheets to the Town's adopted editions, the 2015 I-codes and 2014 NEC, with fire details to the newer 2021 fire code, since a wrong-edition sheet is the other frequent correction. Plan submittals and resubmittals before the 3:30 p.m. cutoff so you do not lose a day, and confirm whether you or your contractor is the permit holder.

This entry sits between the codes and the field work in the Paradise Valley module. The standards your plans are checked against are listed in Paradise Valley Adopted Building Codes . Paradise Valley is in Maricopa County, so a lot with no town sewer or water also needs septic and well approvals, covered in Maricopa County Septic and Well Requirements . To see how Paradise Valley compares with the rest of the metro, see Arizona Building Code Editions by City . For the full sequence of building a home, see the steps to building a custom home in Arizona .

Source

The permit types, portal, fee schedule, and counter hours are published by the Town of Paradise Valley: Building Department on paradisevalleyaz.gov . The adopted codes your plans are checked against are codified in the Town Code, Chapter 5 (Building and Construction) . The owner-builder limit is set by A.R.S. 32-1121 .

This page is general information, not a substitute for the Town's current checklist. Submittal items, fees, and hours change, so confirm the live requirements with the Paradise Valley Building Department before you file.

All City Building Codes
Desert landscape
Build With Us

Begin Your Build

Relax while we manage every detail, throughout the entire process. Tell us about your vision, and we'll be in touch to schedule a consultation.

How can we help?

Call usText us