Apache Junction Building Codes

Adopted codes, residential permits, inspections, zoning setbacks, and fees for building in the City of Apache Junction.

Pinal County8 pages
Permits

Apache Junction Building Permit and Impact Fees for a New Home: The $6,736 Development Fee

Apache Junction charges a new single-family home a development impact fee of $6,736, made of a $3,250 streets fee, $1,707 parks fee, $1,229 police fee, and $550 library fee, collected at the first building permit. The building permit fee itself runs off the ICC Building Valuation Data table. Confirm the live numbers with the city.

Read the reference

Apache Junction Fence, Wall, and Retaining Wall Permit: The 6-Foot and 4-Foot Triggers

Apache Junction requires a building permit for a fence or wall over 6 feet and for a retaining wall over 4 feet measured from the bottom of the footing. Shorter walls are exempt if they meet zoning. A taller wall, or a retaining wall holding a surcharge, needs engineered plans.

Read the reference

Apache Junction Manufactured Home and Park Model Permit: The HUD, State, and City Split

Setting a manufactured home or park model in Apache Junction takes a city installation permit. Federal HUD standards and the Arizona Department of Housing govern how the home is built and anchored, while the city permits and inspects the foundation, utilities, and site before it issues a Certificate of Installation.

Read the reference

Apache Junction Pool and Spa Permit: When It's Required and the Barrier Rules

A swimming pool or spa in Apache Junction needs a city pool and spa permit, and the water cannot be filled until the safety barrier passes inspection. The barrier follows Arizona's statewide floor: a five-foot fence with a self-closing, self-latching gate that opens away from the water.

Read the reference

Apache Junction Residential Building Permit Requirements: What You File and Where

A new home in Apache Junction needs a building permit before any work starts. You apply online through MyGovernmentOnline with a site plan, floor plans, and engineered construction documents including truss plans. Review for codes, zoning, and site conditions currently runs about four to six weeks before the permit issues.

Read the reference