Site Plan

2 min read
In short

A site plan is the scaled overhead drawing of your lot showing where the house and every other structure sit, how far each one stands from the property lines, and where easements, drainage, driveways, and utilities run. Arizona building departments review it before they will issue a permit.

Your floor plan shows the house. The site plan shows the lot, drawn to scale from overhead with the house on it. IRC Section R106.2 requires one with every permit application. It has to give the size and location of new construction, any existing structures, and the distances to the lot lines. Every review discipline reads it, so it is the sheet that stalls a permit.

Maricopa County's checklist shows the real bar. It asks for a north arrow, a vicinity map, a scale bar, the parcel number, and dimensioned property lines. Every structure on the ground gets labeled and measured, fences and propane tanks included. A square-footage table carries the lot coverage math, and overhangs of the first 2 feet from the main building do not count. You show a setback measurement from each structure to each property line, all easements, any wash crossing the parcel, the driveway and its surface material, and the septic tank and disposal field with setbacks to the house, the lot lines, and any well within 100 feet.

Buildable area gets settled here, not in design. On a Scottsdale hillside or Environmentally Sensitive Lands lot, the site plan carries a NAOS dedication. A septic system may not sit inside the NAOS at all. The city's checklist also pins the driveway: 100 feet minimum from the right-of-way line at a street intersection, 25 feet from a side property line, 18 percent maximum slope, and a fire truck turnaround past 200 feet.

For example, a Rio Verde Foothills lot with a wash across one corner can lose its planned pad once the drainage flows and septic setbacks land on the drawing.

A plat is the recorded map that created the lot. The site plan is your house on that lot. Scottsdale rejects incomplete submittals without giving correction comments. That pushes a thin plan to a third round before a permit issues.

Keep exploring

Short answers first. Open one to read it here.

What is a pre-construction meeting and what happens there?

A pre-construction meeting is the sit-down you and your builder have after signing the contract and before breaking ground.

Read the full answer
What permits does a septic system need, and what is the transfer-of-ownership inspection?

A septic system needs county permitting before construction under ADEQ's R18-9 rules, handled locally by Maricopa County Environmental Services.

Read the full answer
What do Maricopa County's rural residential zoning districts (like RU-43) allow?

In unincorporated Maricopa County, low-density home sites usually sit in a rural district like RU-43, which sets a one-acre minimum lot, allows a...

Read the full answer
How does temporary construction power and the meter spot work on a new Arizona home?

Your builder requests a meter spot from the utility (SRP or APS) to mark where service will go, then sets a temporary power pole for construction.

Read the full answer
All terms
Desert landscape
Build With Us

Begin Your Build

Relax while we manage every detail, throughout the entire process. Tell us about your vision, and we'll be in touch to schedule a consultation.

How can we help?

Call usText us